• Chambéry area: 17 Avenue du Lac Léman 73370 Le Bourget du Lac | Grenoble area : 79 Rue Général Mangin 38100 Grenoble

Your Project

Hydrogen Stations Designed for All Vehicles and Applications

AT YOUR SIDE

Atawey designs high-performance, configurable hydrogen refueling stations, tailored to meet the needs of all types of vehicle fleets—regardless of size, usage, or sector. Whether you are a local authority, business, project developer, or transport operator, Atawey supports you at every stage to ensure the success of your hydrogen project.

EXPERT
Our products

Configurable hydrogen stations

Discover Our Hydrogen Stations

DEDICATED
Our Services

Accompagnement 360

Discover our Services

CONTACT
At your service

Contact us

Contact Atawey to discuss your project!

Let's talk about you

Hydrogen Stations Tailored to Your Industry and Needs

SUPPORT

Are you, or is your client:

Station hydrogène du réseau ZEV en Savoie, ravitaillant un bus hydrogène.
01

A Long-Distance Transport Fleet Operator?

Atawey provides high-capacity hydrogen stations specifically designed for the energy demands of trucks (rigid or tractor units) and coaches. These stations comply with AFIR (Alternative Fuel Infrastructure Regulation) standards, ensuring fast and efficient refueling—making hydrogen a viable solution for long-haul transport while reducing carbon emissions.

02

A Public Transport or Waste Collection Operator?

For local governments and urban mobility networks, Atawey offers hydrogen solutions for buses and refuse collection vehicles (RCVs). These stations support clean mobility initiatives in urban environments by significantly cutting greenhouse gas emissions.

Station hydrogène Atawey à Givrand, intégrée au réseau de mobilité locale.
Station compacte Atawey ravitaillant un fourgon hydrogène.
03

A Light Commercial Vehicle (LCV) or Van Fleet Manager?

Atawey has developed compact, flexible hydrogen stations, ideally suited for light commercial vehicles. These solutions help businesses decarbonize their delivery and service fleets, ensuring an efficient technological transition for high-frequency transport operations.

04

A Warehouse Logistics Operator?

For warehouse and logistics operations, Atawey provides hydrogen stations designed for fueling forklifts and other material-handling equipment. These hydrogen-powered infrastructures reduce warehouse carbon footprints while maintaining high operational efficiency (fast refueling, back-to-back operation, remote fueling points, etc.).

Engin de logistique hydrogène utilisant une station mobile Atawey sur site.
Station hydrogène mobile Atawey déployée pour les applications temporaires.
05

A Construction Equipment Fleet Manager?

Atawey offers mobile hydrogen stations for construction sites, enabling the use of zero-emission construction machinery. These solutions support the decarbonization goals of the construction and public works sector by eliminating on-site emissions.

Contact us

Ready to Start Your Hydrogen Project?

WE ARE LISTENING

Atawey guides you at every step to design a hydrogen station perfectly suited to your needs—today and in the future.

📞 Contact Atawey to discuss your project!

Questions & Answers

Hydrogen Mobility Projects

Q&A

Hydrogen-powered mobility enables carbon-free transport while offering key advantages:

  • Extended range – Hydrogen vehicles provide greater autonomy than battery-electric vehicles (up to 700 km for light vehicles, over 1,000 km for heavy-duty vehicles).
  • Fast refueling – Refueling takes less than 10 minutes for light vehicles and under 20 minutes for heavy-duty vehicles.
  • Ideal for intensive and heavy-duty fleets – Hydrogen is the perfect solution for trucks, buses, and construction machinery where battery-electric alternatives may not be viable.
  1. Feasibility Study – Analyzing requirements (vehicle types, hydrogen volume, site selection).
  2. Solution Selection – Choosing the right station type (scalable, mobile, compact) and associated infrastructure.
  3. Financing Strategy – Identifying public funding opportunities and potential co-investments.
  4. Design & Deployment – Station installation and energy network integration.
  5. Operations & Maintenance – Ongoing monitoring, supervision, and proactive maintenance.

A well-structured project ensures long-term investment viability and high-performance hydrogen infrastructure.